Carly Anne Shaver — based in Connecticut

Design Intern Presentations and Projects

This contains the work I have completed while at my Design Intership at Baystate Health in Springfield, MA. It includes: before and after presentation boards completed, drawings of projects completed, etc.

ForBaystate Health

Before-Construction Board. This board contains the information neccessary for Construction Sites. Information includes: Project Information, Permits, Infection Control, ILSM Daily Worksheet and ILSM Report. All information is prepared before the project begins.

After-Construction Board. Worked with the Marketing Department to create a clean, simplified, easy to use board used to display information neccsessary for construction sites.

Medicine Staff Space S2667. Objective: Create counter space for three providers and one administration. The project consisted of renovating S2667 at the Main hospital with electrical and painting/patching. As project manager, I designed the space, chose the finishes, furniture and oversaw the construction process and finances. The project was completed in two months.

Final Counter

Flex Team Locker Room SG590. Objective: Turn existing space into a Locker Room for 150 nursing staff. The project consisted of renovating SG590 at the Main hospital by removing counters, binder bins, power, and telephone/data and meeting the HVAC requirements and fire rating. As project manager, I designed the space, chose the finishes, furniture and oversaw the construction process and finances. After complications, the project was completed in two months.

Before-Coat Closet

After- Coat Closet

Before- Mailbox Closet

Before- Mailbox Space, 3rd Floor

After- New Mailbox closet.

Before- Refridgerator Closet

After- Refridgerator Closet

After- South Wall with Closets.

After- North and East Walls with new lockers.

After- West and South Walls with new HVAC system.

After- East and South walls with new lockers and coat closet.